Warning: Undefined array key "HTTP_ACCEPT_LANGUAGE" in /home/optieng/public_html/js/lang.php on line 7

Deprecated: substr(): Passing null to parameter #1 ($string) of type string is deprecated in /home/optieng/public_html/js/lang.php on line 7
Optieng: Petrochemical Industry
Repsol Project:  Sines, Portugal

Repsol Project: Sines, Portugal

Study, design and detail engineering of 2 polymer extruders to change from a manual control start-up, in to a full automatic operation, in a total of 300 I/O points.
For the automatic start-up of the extruders a complete field instrumentation study was necessary to re-engineer the control philosophy.

If you have any questions about our solutions and products, please contact us!