Artelia: Co-Generation Power Plant, Sines Portugal
Programming , test and star-up of one DCS system, Metso DNA for Artélia Co-generation power plant in Sines, in a total of 1.800 I/O points.
Optieng was responsible for assembling and cross-connection wiring for all control cabinets.