Configuration, programming, commissioning and start-up of a DCS control system, Metso DNA for the control of the Energy Recovery Island in Celbi mill Figueira da Foz, with the following elements:
Recovery Boiler;
Biomass Boiler;
Evaporation plant;
The total configuration of this system had in average 4.000 I/O points Commissioning and start-up of the SIL3 safety systems Hima HiQuad, for the two boilers.